| * denotes a required field. |
Contact Information |
|
Company Name |
|
|
*Contact Name/Title |
|
|
*Address |
|
|
*City, State & Zip |
|
|
*E-Mail Address |
|
|
*Phone Number |
|
|
FAX Number |
|
Information Requested |
|
For Immediate Use |
|
|
For Future Reference |
|
|
Other |
|
Project Requirements |
|
|
|
|
|
|
|
|
|
|
|
Other:
|
Site Availability |
|
Minimum Site Size |
|
|
Maximum Site Size |
|
Existing Facilities |
|
Minimum Building Size |
|
|
Maximum Building Size |
|
Utility Needs |
|
Water Requirements |
|
Number of gallons/day (gpd) |
|
|
Peak flow (gallons per minute) |
|
|
Sewer Requirements |
|
Number of gallons/day (gpd) |
|
|
Peak flow (gallons per minute) |
|
|
Discharge Content (ppm or mg/l): |
|
|
Biochemical Oxygen Demand (B.O.D) |
|
|
Total Suspended Solids (T.S.S) |
|
|
Chemical Oxygen Demand (C.O.D) |
|
|
pH |
|
|
Temperature:
|
|
|
Electricity Requirements |
|
Total kWH hours per month |
|
|
Peak kW Demand: |
|
|
Are there any unusual fluctuations in load? |
|
|
Natural Gas Requirements |
|
Volume MCF/day (million cubic fee/day) |
|
|
Pressure Requirements (pounds/square inch) |
|
|
Transportation Requirements |
|
Please rank the service required, and indicate preferred distance from the following: |
|
|
|
Total Project Investment |
|
|
|
Projected Project Employment Levels |
|
|
|
|