|
|
|
Fee |
|
(1) Meter Adapter Kit |
9-1-12 |
$80 |
|
(2) Meter MXU Transmitter |
9-1-12 |
$85 |
|
(3) Meter MXU for 1-inch & larger meters |
9-1-12 |
$144 |
|
|
9-1-12 |
$146 |
|
1 inch meter |
9-1-12 |
$183 |
|
1 ½ inch meter |
9-1-12 |
$399 |
|
|
9-1-12 |
$542 |
|
|
|
|
|
|
9-1-12 |
$2,052 |
|
|
9-1-12 |
$2,884 |
|
|
|
|
|
Pressurized Irrigation Assessment for Secondary Connection |
9-1-12,28 |
$525 |
New Construction
(1) Required on some commercial projects when developer’s engineer/architect specifies a larger meter setter than the meter that is initially required. For example, a 2-inch setter is specified and a 2-inch meter will be used when the project is built-out. However, only a 1 1/2 –inch meter is initially needed, requiring the adaptor kit that the Water Division presently pays for.
(2) Recovers cost of radio read transmitter unit on all new meters set.
(3) Recovers full cost of a single MXU unit in situations where two meters cannot share a single meter vault. MXU units for most residential serve two meters serving two houses.
Water System Repair Fees (Ord. 9-1-12.E)
Damage – Item Repaired |
Fee |
|
5/8 and ¾ inch angle valves |
$15.00 |
|
Meter heads |
$72.00 |
|
5/8 x ¾ inch meter |
$119.00 |
|
|
$146.00 |
|
1 inch meter |
$183.00 |
|
|
$399.00 |
|
|
$542.00 |
|
|
|
|
|
$2,052.00 |
|
|
$2,884.00 |
|
|
$4.35 |
|
|
$93.00 |
|
|
$1,049.00 |
|
|
$79.00 |
|
|
$91.00 |
|
|
$80.00 |
|
|
$6.11 |
|
|
$129.00 |
|
|
$150.00 |
|
|
$16.00 |
|
|
|
|
|
$25 |
|
|
$25 |
Other Miscellaneous Fees (Ord. 9-1-14)
Item |
Fee |
|
Meter Lockout of Illegal Turn-On |
$50.00 |
|
Hourly Charge, Service Call |
$35.00 |
|
Meter Reinstall Fee (does not include actual meter) |
$20.00 |
|
|
$5.00 |
Engineering/Development Services
QA/QC Plan Review Fee
Applies to all subdivision projects and commercial projects with public water or sewer mains.
Subdivisions
0 to 50 building lots: $100
51 to 100 building lots: $175
More than 100 building lots: $250
Commercial
$50 per project